SECUVIA Systems and Services

SECUVIA Hadath Office

Beirut, Hadath

HomeProjectsData Center Cable Management
// PROJECT CASE STUDY

Data Center Cable Management

Data Center Cable Management - view 1
1 / 2

Project Specs

LocationHadath, Lebanon
Client / ContractorNational Telecom Provider
Completion Year2023
StatusCompleted

Systems Installed:

Electrical Conduits and Cable TraysSmoke Extraction FansDampers (Fire & Smoke)

The Engineering Challenge

Data cables required complete separation from high-voltage power paths to prevent electromagnetic interference (EMI), with zero downtime during active telecom operations.

The SECUVIA Solution

We installed overhead heavy-duty ladder trays for high-voltage runs and under-floor wire-mesh baskets for data paths. The trays were grounded using copper bonding strips to eliminate static buildup.

Contract Work Scope

Multi-layered cable ladder tray installation
Under-floor routing grids for fiber and power separation
Smoke extraction fan installation in server modules
Earthing and ground bonding of all metal structures

Detailed Solution Specs

Smoke Extraction Fans

High-temperature axial and centrifugal fans engineered to extract smoke and toxic fumes from egress routes during a fire.

View full technical specification

Dampers (Fire & Smoke)

Automated fire and smoke dampers that close automatically to prevent the spread of fire and smoke through air ducts.

View full technical specification

Electrical Conduits and Cable Trays

Heavy-duty hot-dip galvanized cable trays, trunkings, and PVC/EMT conduit systems for safe power and data routing.

View full technical specification