PVC, PPR and Drainage Systems
Piping networks for domestic hot/cold water distribution and high-quality gravity drainage piping systems.

System Overview
SECUVIA delivers complete plumbing installations. We supply and lay PPR pipes for clean water lines, alongside high-density PVC/PPR pipes for wastewater drainage, rainwater drainage, and chemical waste drainage.
Our Capabilities
- Water pressure head and drainage slope calculations
- Thermal fusion welding of PPR pipes and solvent gluing of PVC joints
- Installation of vertical stacks, branch lines, and floor traps
- Piping pressure testing and gravity leak checks
Key Applications
- -Domestic Hot and Cold Water Supply Networks
- -Soil, Waste, and Vent Piping for Buildings
- -Rainwater Roof Drainage and Stormwater Pipes
- -Condensate Drain Lines for HVAC Equipment
Equipment & Components
- //PPR (Polypropylene Random) Fusion-welded Pipes
- //uPVC (Unplasticized PVC) Solvent-welded Drainage Pipes
- //PEX (Cross-linked Polyethylene) Flexible Pipe systems
- //Main Water Distribution Manifolds and Valves
- //Floor drains, cleanouts, and plumbing vents
Code Standards & Compliance
Systems are selected, sized, and installed in complete conformity with the following international code requirements:
Related Support Services
Supply
Selection and delivery of suitable equipment and materials according to approved specifications and project requirements.
Install
Professional installation by qualified engineers and technicians, coordinated with site requirements and related trades.
Testing & Commissioning
System verification, functional testing, programming and commissioning before official handover.
Shop Drawings
Detailed shop drawings, routing plans, and isometric layouts prepared for precise site installation.
MEP Design
Engineering design, coordination and detailed drawings to support accurate execution.
Completed System Projects

Commercial Mall Fire Protection
High ceilings in the main atrium required complex hydraulic pressure considerations to ensure sufficient sprinkler discharge density. The food court also required independent zone controls for grease hood fire safety.

Residential Tower MEP Install
Coordination of structural duct routes with low-ceiling clearance in basement parking zones to prevent clashes between cable trays and drainage pipes.